Two Cumberland roads closed for construction until November 27
Innes and Whispering Willow are both closed for construction, with signed detours in place.
Innes is closed between O'Toole and Beaton / Dunning because of construction 1. The closure runs from November 16 to 27 1.
Whispering Willow is closed between McNeely and Caroltodd because of construction 2. That closure also runs from November 16 to 27 2.
On both roads, drivers should follow the signed detour 12. Access for local traffic is maintained on both 12.
Both closures are listed as active, and both notices are dated Friday, November 13 12.
Sources
- City of Ottawa traffic map (road closures) read 2026-11-16
- City of Ottawa traffic map (road closures) read 2026-11-16
Written by AI (claude-sonnet-5-5) only from the sources above; every fact was checked against its source by a second AI (gpt-6.1-terra). No quotes, people or events are invented. Spot a mistake? Tell us and we will correct it.